{"id":1600,"date":"2022-02-26T09:23:55","date_gmt":"2022-02-26T02:23:55","guid":{"rendered":"https:\/\/stevensondang.com\/?p=1600"},"modified":"2022-02-26T09:23:55","modified_gmt":"2022-02-26T02:23:55","slug":"how-to-define-project-deliverables","status":"publish","type":"post","link":"https:\/\/stevensondang.com\/blog\/how-to-define-project-deliverables\/","title":{"rendered":"Define Project Deliverables and Success Criteria"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_82_2 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/stevensondang.com\/blog\/how-to-define-project-deliverables\/#Clarity_Before_Completion_Why_Deliverables_and_Metrics_Matter\" >Clarity Before Completion: Why Deliverables and Metrics Matter<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/stevensondang.com\/blog\/how-to-define-project-deliverables\/#What_Are_Project_Deliverables\" >What Are Project Deliverables?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/stevensondang.com\/blog\/how-to-define-project-deliverables\/#Why_Deliverables_Matter\" >Why Deliverables Matter<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/stevensondang.com\/blog\/how-to-define-project-deliverables\/#Step_1_Identify_the_Final_Deliverables\" >Step 1: Identify the Final Deliverables<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/stevensondang.com\/blog\/how-to-define-project-deliverables\/#Step_2_List_the_Intermediate_Deliverables\" >Step 2: List the Intermediate Deliverables<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/stevensondang.com\/blog\/how-to-define-project-deliverables\/#Step_3_Define_Success_Criteria\" >Step 3: Define Success Criteria<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/stevensondang.com\/blog\/how-to-define-project-deliverables\/#Step_4_Document_and_Share_Early\" >Step 4: Document and Share Early<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/stevensondang.com\/blog\/how-to-define-project-deliverables\/#Step_5_Track_and_Validate\" >Step 5: Track and Validate<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/stevensondang.com\/blog\/how-to-define-project-deliverables\/#Common_Pitfalls_to_Avoid\" >Common Pitfalls to Avoid<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/stevensondang.com\/blog\/how-to-define-project-deliverables\/#Real-Life_Case_Marketing_Campaign_Launch\" >Real-Life Case: Marketing Campaign Launch<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/stevensondang.com\/blog\/how-to-define-project-deliverables\/#Summary\" >Summary<\/a><\/li><\/ul><\/nav><\/div>\n<h2 data-pm-slice=\"1 1 []\"><span class=\"ez-toc-section\" id=\"Clarity_Before_Completion_Why_Deliverables_and_Metrics_Matter\"><\/span>Clarity Before Completion: Why Deliverables and Metrics Matter<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A project without clear deliverables is like a ship without a destination. You can steer all you want\u2014but how will you know when you\u2019ve arrived?<\/p>\n<p>As someone who has spent over 15 years delivering digital transformation and business growth initiatives, I\u2019ve learned this firsthand: <strong>defining what \u201cdone\u201d looks like\u2014before starting\u2014is non-negotiable.<\/strong><\/p>\n<p>In this guide, I\u2019ll walk you through Define Project Deliverables and Success Criteria that keep your team aligned, your stakeholders confident, and your project measurable from start to finish.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"What_Are_Project_Deliverables\"><\/span>What Are Project Deliverables?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><strong>Project deliverables are the tangible or intangible outputs your project promises to produce.<\/strong> You commit to delivering these results by the end\u2014or at key stages\u2014of your project lifecycle.<\/p>\n<p>There are typically two categories:<\/p>\n<ul data-spread=\"false\">\n<li><strong>Final Deliverables:<\/strong> What the project is ultimately meant to produce<\/li>\n<li><strong>Intermediate Deliverables:<\/strong> Milestones or outputs that pave the way to the final goal<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Why_Deliverables_Matter\"><\/span>Why Deliverables Matter<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul data-spread=\"false\">\n<li><strong>Define scope<\/strong> \u2014 They outline what is and isn\u2019t included in the project.<\/li>\n<li><strong>Guide progress<\/strong> \u2014 They provide milestones to measure during execution.<\/li>\n<li><strong>Support stakeholder alignment<\/strong> \u2014 Everyone agrees on what success looks like.<\/li>\n<li><strong>Drive accountability<\/strong> \u2014 Teams know exactly what they\u2019re working toward.<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Step_1_Identify_the_Final_Deliverables\"><\/span>Step 1: Identify the Final Deliverables<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><strong>Goal:<\/strong> Define the end-state result that your project is designed to achieve.<\/p>\n<p><strong>Example:<\/strong> Imagine you\u2019re managing a scheduling system upgrade. Your final deliverables could include:<\/p>\n<ul data-spread=\"false\">\n<li>A fully functioning digital scheduling platform<\/li>\n<li>A documented scheduling policy<\/li>\n<li>A trained operations team<\/li>\n<\/ul>\n<p><strong>Tip:<\/strong> Focus on <em>outcomes<\/em>, not just <em>activities.<\/em> A project isn\u2019t successful because you held meetings\u2014it\u2019s successful because those meetings led to tangible results.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Step_2_List_the_Intermediate_Deliverables\"><\/span>Step 2: List the Intermediate Deliverables<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><strong>Goal:<\/strong> Map out the checkpoints that will show you\u2019re on the right track.<\/p>\n<p><strong>Example:<\/strong> For the same scheduling system upgrade, intermediate deliverables might include:<\/p>\n<ul data-spread=\"false\">\n<li>Signed vendor contract<\/li>\n<li>Completion of first system test<\/li>\n<li>User training deck<\/li>\n<\/ul>\n<p>These aren\u2019t necessarily seen by customers, but they\u2019re vital to internal project momentum.<\/p>\n<p><strong>Tip:<\/strong> Align intermediate deliverables with reporting cycles. That way, each status report shows meaningful progress.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Step_3_Define_Success_Criteria\"><\/span>Step 3: Define Success Criteria<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><strong>Goal:<\/strong> Establish how you will determine whether your deliverables meet expectations.<\/p>\n<p><strong>Example:<\/strong> For the scheduling system project:<\/p>\n<ul data-spread=\"false\">\n<li><strong>Final Deliverable Success:<\/strong> 90% of users can complete a scheduling task in under 2 minutes<\/li>\n<li><strong>Intermediate Deliverable Success:<\/strong> Vendor contract signed by legal and procurement by X date<\/li>\n<\/ul>\n<p>Success criteria should be:<\/p>\n<ul data-spread=\"false\">\n<li><strong>Specific<\/strong> \u2014 Clear and unambiguous<\/li>\n<li><strong>Measurable<\/strong> \u2014 Quantified wherever possible<\/li>\n<li><strong>Aligned<\/strong> \u2014 Reflect project and business objectives<\/li>\n<li><strong>Time-bound<\/strong> \u2014 Include deadlines or performance windows<\/li>\n<\/ul>\n<p><strong>Tip:<\/strong> When success is subjective (e.g., \u201cbetter user experience\u201d), build in customer feedback tools like surveys or usability scores.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Step_4_Document_and_Share_Early\"><\/span>Step 4: Document and Share Early<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><strong>Goal:<\/strong> Make sure stakeholders and teams are aligned from day one.<\/p>\n<p>Deliverables and success criteria should be included in:<\/p>\n<ul data-spread=\"false\">\n<li>The <strong>project charter<\/strong><\/li>\n<li>Your <strong>work breakdown structure (WBS)<\/strong><\/li>\n<li>Kickoff presentations<\/li>\n<\/ul>\n<p>This prevents scope creep, misinterpretation, and surprises later on.<\/p>\n<p><strong>Tip:<\/strong> Use visuals like tables or charts to show how deliverables link to outcomes.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Step_5_Track_and_Validate\"><\/span>Step 5: Track and Validate<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><strong>Goal:<\/strong> Actively monitor deliverables and validate them upon completion.<\/p>\n<p>Use tools like:<\/p>\n<ul data-spread=\"false\">\n<li><strong>Checklists<\/strong> to confirm when deliverables are met<\/li>\n<li><strong>KPI dashboards<\/strong> to track success metrics<\/li>\n<li><strong>Sign-off templates<\/strong> for stakeholder validation<\/li>\n<\/ul>\n<p><strong>Example:<\/strong> For a new feature launch:<\/p>\n<ul data-spread=\"false\">\n<li>Intermediate: Feature passes QA testing by sprint 3<\/li>\n<li>Final: 10% increase in feature adoption within one month post-launch<\/li>\n<\/ul>\n<p><strong>Tip:<\/strong> Set review gates throughout the project for course correction before final delivery.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Common_Pitfalls_to_Avoid\"><\/span>Common Pitfalls to Avoid<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul data-spread=\"false\">\n<li><strong>Vague deliverables<\/strong> \u2192 Replace \u201cbetter visibility\u201d with \u201cmonthly dashboard with 5 core KPIs.\u201d<\/li>\n<li><strong>No metrics<\/strong> \u2192 You can\u2019t manage what you can\u2019t measure.<\/li>\n<li><strong>Assumed success<\/strong> \u2192 Always define what \u2018good enough\u2019 looks like.<\/li>\n<li><strong>Not involving end-users<\/strong> \u2192 If you don\u2019t define success with users in mind, you risk delivering outputs no one wants.<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Real-Life_Case_Marketing_Campaign_Launch\"><\/span>Real-Life Case: Marketing Campaign Launch<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><strong>Project:<\/strong> Launch a regional digital ad campaign<\/p>\n<p><strong>Final Deliverables:<\/strong><\/p>\n<ul data-spread=\"false\">\n<li>Four campaign creatives (video, carousel, banner, copy)<\/li>\n<li>Campaign live on three digital platforms<\/li>\n<li>Post-campaign analytics report<\/li>\n<\/ul>\n<p><strong>Intermediate Deliverables:<\/strong><\/p>\n<ul data-spread=\"false\">\n<li>Creative concept approval<\/li>\n<li>Media buy confirmation<\/li>\n<li>A\/B test results<\/li>\n<\/ul>\n<p><strong>Success Criteria:<\/strong><\/p>\n<ul data-spread=\"false\">\n<li>CTR of 1.2%+ for key ads<\/li>\n<li>50k impressions within the first week<\/li>\n<li>Client sign-off on all assets before launch<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Summary\"><\/span>Summary<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Project deliverables define the \u201cwhat.\u201d Success criteria define the \u201chow well.\u201d Together, they keep your project focused, measurable, and aligned.<\/p>\n<ul data-spread=\"false\">\n<li>Start with the final outcomes<\/li>\n<li>Break them down into milestones<\/li>\n<li>Define what success looks like in numbers<\/li>\n<li>Share it early and often<\/li>\n<li>Track and validate throughout the execution<\/li>\n<\/ul>\n<p>A successful project isn\u2019t about how hard you work\u2014it\u2019s about <strong>delivering the right results in the right way.<\/strong><\/p>\n<p>And if you\u2019re looking to bring clarity, discipline, and real business impact to your next project, I\u2019m here to help.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Clarity Before Completion: Why Deliverables and Metrics Matter A project without clear deliverables is like&#8230;<\/p>\n","protected":false},"author":1,"featured_media":1618,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","meta_keywords":"","rank_math_focus_keyword":"Define Project Deliverables"},"categories":[7],"tags":[],"newstopic":[],"class_list":["post-1600","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-practical-management"],"_links":{"self":[{"href":"https:\/\/stevensondang.com\/blog\/wp-json\/wp\/v2\/posts\/1600","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stevensondang.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stevensondang.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stevensondang.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/stevensondang.com\/blog\/wp-json\/wp\/v2\/comments?post=1600"}],"version-history":[{"count":0,"href":"https:\/\/stevensondang.com\/blog\/wp-json\/wp\/v2\/posts\/1600\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stevensondang.com\/blog\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/stevensondang.com\/blog\/wp-json\/wp\/v2\/media?parent=1600"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stevensondang.com\/blog\/wp-json\/wp\/v2\/categories?post=1600"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stevensondang.com\/blog\/wp-json\/wp\/v2\/tags?post=1600"},{"taxonomy":"newstopic","embeddable":true,"href":"https:\/\/stevensondang.com\/blog\/wp-json\/wp\/v2\/newstopic?post=1600"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}